YEAR: 2025
The FY24–25 Road Rehabilitation Program, comprised of approximately 67,500 m² of pavement renewal across six key roads within the LGA. The works addressed pavement failures and roughness through in-situ stabilisation to 200 mm depth, gravel correction, and sealing treatments tailored to site conditions.
The project also included traffic management, BYDA service locating, compaction and ball penetration testing, and reinstatement of roadside assets.
The program significantly improved pavement strength, drainage, and ride quality across the Maranoa network.